Video: 123 Cermak Crane Climb and Inspection
June 23, 2017 in Land Development , Site preparation , Videos
Video: 123 Cermak Crane Climb and Inspection

123 Cermak Crane Climb and Inspection from James McHugh Construction Co. on Vimeo.James McHugh Construction Co. released a Crane Climb and Inspection video of its 123 Cermak job site.

Year in Infrastructure 2017
June 7, 2017 in Events , Videos
Year in Infrastructure 2017

See presentations that inspire, including what’s next in Bentley software, thought-provoking guest keynotes, and this year’s industry advancements. Hear from the best and brightest speakers and discover the award-winning infrastructure projects that are advancing infrastructure in design, engineering, construction, and operations around the world. Make plans to join us October 10-12 in Singapore: http://www.bentley.com/yii2017

Video: Earthquake Safety: Building the World’s First “Flexible” Bridge
June 5, 2017 in Bridges , Videos
Video: Earthquake Safety: Building the World’s First “Flexible” Bridge

Seattle’s newest bridge is built to do much more than withstand an earthquake – it’s built with columns designed to move with the ground and flex back into their original vertical shape after a strong quake. This new bridge is designed to remain open immediately after a powerful earthquake, when emergency response is critical. The Washington State Department of Transportation partnered with the University of Nevada’s Center for Advanced Technology in Bridges and Infrastructure in developing the...

Video: Overview of the New Champlain Bridge Worksite - April 2017
May 22, 2017 in Transportation , News , Projects , Videos
Video: Overview of the New Champlain Bridge Worksite - April 2017

Curious to see the evolution of the construction of the new Champlain Bridge as the crow flies? Take a moment to view our new drone images taken last April. An excellent overview of the work progress and a good way to see the colossal work carried out by our teams in the last months! You will be able to see the three main working platforms, the East Approach, the West Approach and finally the Cable-Stay Bridge. Ready for takeoff?

Video: We Are Expecting To Hire 3,000 New Employees: AECOM CEO
May 19, 2017 in Transportation , News , Videos
Video: We Are Expecting To Hire 3,000 New Employees: AECOM CEO

Michael Burke, AECOM CEO, discusses how the company is expecting to create 3,000 new jobs in the U.S. and Canada over the next six months.

Video: Largest Ship Ever to Dock on East Coast Port
May 15, 2017 in Transportation , Site preparation , Videos
Video: Largest Ship Ever to Dock on East Coast Port

The Port of Savannah, the largest single container terminal in North America, handles the largest ship to ever call the U.S. East Coast. Watch the 30-hour journey of the COSCO Development in Savannah.

Video: PERI ACS Core 400 Climbing Formwork
May 6, 2017 in Technology , Buildings , Videos
Video: PERI ACS Core 400 Climbing Formwork

The new ACS Core 400 Climbing Formwork has been designed specifically for High-Rise cores. The system features a high capacity single stroke cylinder that climbs to the next level in only 20 minutes, while less brackets, anchors and overall parts and pieces result in faster cycling times with less labor.

Video: MDOT Bridges: Repair vs. Replace
May 1, 2017 in Transportation , Bridges , Videos
Video: MDOT Bridges: Repair vs. Replace

Whether it’s an interstate over the Mississippi River or a local highway over a small creek, MDOT maintains over 5,000 bridges across the state. Learn more about how bridges are prioritized for repair or replacement, and how much each method costs to extend the life of a bridge.

Tappan Zee Bridge Stay Cable Installation
April 19, 2017 in Bridges , Videos
Tappan Zee Bridge Stay Cable Installation

Crews have finished installing the stay cables on the westbound span of the new Tappan Zee Bridge, the first portion of the bridge set to open later this year. The last of the 96 stay cables, the long metal strands hung off the new bridge's main span towers to suspend the road deck over the deepest part of the Hudson River, was installed last week on the Rockland-bound span, leaving a small gap in the main span.

Showing 411 to 420 of 431 posts

Stormwater Interview with Robert Page, P.E., Vice President, HNTB

Stormwater Interview with Robert Page, P.E., Vice President, HNTB

TriMet’s Banfield Type 1 Substation Replacement Project

TriMet’s Banfield Type 1 Substation Replacement Project

February Issue 2026

February Issue 2026