Interstate Bridge Replacement Program to Publish Draft SEIS Sept. 20
The Interstate Bridge Replacement program will publish its Draft Supplemental Environmental Impact Statement (SEIS) next Friday, Sept. 20, 2024. Its release will mark the beginning of the official 60-day public comment period, which will run through Nov. 18, 2024. For more information, please visit IBR Draft SEIS. The IBR program will conduct extensive notification and outreach to get the word out to the community when the document is available, and public comment officially opens on Sept. 20...
Slow & Steady Progress Repairing America’s Bridges, According to Latest Federal Government Data
States Dedicating 2021 Infrastructure Law Funds to 4,100+ Projects National and State Rankings Available: www.artbabridgereport.org (WASHINGTON)— Nearly 221,800 U.S. bridges need major repair or replacement, an American Road & Transportation Builders Association (ARTBA) analysis of recently released federal government data shows. Placed end-to-end, these structures span over 6,100 miles, or the equivalent of every mile of urban and rural Interstate in California, Florida, and Illi...
AREMA/NSBA Present Constructability, Fabrication Guidelines for Steel Railroad Bridges
CHICAGO - There’s a vital new resource available for anyone who designs steel railroad bridges, thanks to a collaboration between the American Railway Engineering and Maintenance-of-Way Association and the National Steel Bridge Alliance. The document, “Guidelines for the Design of Steel Railroad Bridges for Constructability and Fabrication,” describes special considerations for railroad bridges in the areas of design, girders, boxes, trusses, floor systems, decks and walkways, bolting, corro...
Acrow Bridges Installed to Carry Detoured Traffic During Highway Construction in Alabama
Structures provide a safe, cost-effective alternative to phased construction in Centreville (Parsippany, New Jersey) – Acrow, a leading international bridge engineering and supply company, has announced two of its modular steel bridges have been installed in Centreville, Alabama, to minimize inconvenience to motorists during a project to replace two aging bridges on State Route 5. The detour bridges were considered essential to the success of the project, as no reasonable alternate route...
ODOT Taps Woolpert for Bridge Replacement, Maintenance Contracts
The contracts proactively address aging infrastructure to support transportation safety throughout the state. DAYTON, Ohio — The Ohio Department of Transportation has hired Woolpert for two separate engineering contracts to support bridge maintenance, repair, and replacement projects throughout the state. The first contract supports ODOT District 9’s bridge replacement projects on State Route 772 in a rural area of Huntington Township in Ross County and State Route 138 near Clarksburg, Ohi...
Fluor Joint Venture Celebrates Connection of Gordie Howe International Bridge Deck
IRVING, Texas – Fluor Corporation (NYSE: FLR) and its partners today celebrated the official deck connection of the Gordie Howe International Bridge spanning the Detroit River. Measuring a half-mile (853 meters), the bridge connects Windsor, Ontario, Canada, and Detroit, Michigan, United States. It is the longest cable-stayed bridge in North America and 10th longest in the world. The bridge also has the distinction of being the longest composite steel and concrete decked cable-stayed bridge in t...
INVESTING IN AMERICA: Biden-Harris Administration Announces $5 Billion to Restore, Reconstruct, and Repair Nationally Significant Large Bridges Across the Country
Thirteen major bridges to receive funding through President Biden’s Bipartisan Infrastructure Law, improving the safety and efficiency of critical supply chain corridors, creating good-paying jobs, and supporting the national economy WASHINGTON – Today, to kick off the Biden-Harris Administration’s Investing in America tour, U.S. Transportation Secretary Pete Buttigieg announced more than $5 billion in Large Bridge Project awards through the Federal Highway Administration’s (FHWA) compet...
Fugro supports US 51 bridge redesign with nearshore geotechnical expertise
Lift boat mobilised for work on the US 51 Cairo Bridge project Fugro is performing a nearshore geotechnical study to support the site investigation phase for the new US 51 Cairo Bridge in Ballard County, Kentucky. The current bridge, built in 1936, connects Wickliffe, Kentucky, to Cairo, Illinois, and carries a high volume of commercial truck traffic over the Ohio River. However, its narrow lanes and shoulders are inadequate for oversize or overweight loads. Fugro’s study will focus...
Critical dewatering operations ensure on-time delivery of bridge construction project in the Philippines
Atlas Copco’s footprint and expertise have improved critical dewatering operations on a strategic infrastructure project in The Philippines. The Dipolog-Dapitan bridge project is one of several development initiatives on the island of Mindanao, intended to boost economic growth in the region. Despite high levels of rainfall, safe working conditions have been maintained and the project has been kept on schedule through the deployment of Atlas Copco dewatering pumps. The island of Mindana...
Acrow to Supply 186 Modular Steel Bridges to the Republic of Angola
Major infrastructure program will enhance connectivity and support transformative economic development (Parsippany, New Jersey) – Acrow, a leading international bridge engineering and supply company, is pleased to announce a project to supply 186 modular steel bridges to the Republic of Angola. The structures will contribute to efforts to modernize Angola’s road and transportation infrastructure and will be installed throughout the country by Angolan engineers, technicians and contractor...